Ok, so just to clear the air, (pun intended) if the job I did caused a hazardous situation, then the out gassing of a TPE doll will kill you just as well.
I do use a carbon filter respirator when doing very large or time consuming jobs like full on vulva reconstruction etc, but really, this was an in and out job.
OK, with that out of the way, Mr. Murphy paid me a visit, of course the other joint of the back, the side to side joint started spitting out fragments of its hardened steel washers as well, so I took some pictures of this little quagmire.
Not the juiciest nightmare I’ve ever encountered, but still not one you would want to eat over the carpet.
So here we go, going to continue on al a Chiltons manual style.
11, Yep, they really welded the nut on this one very well, so I had to drill out the head of the 10mm button head.
Freakin gory mess! This is the job right after I drilled and used a chisel to pop the head off.
Thankfully the head was facing backwards towards the opening.

12, Oh yippie! Just what I wanted to do right after a hard days work!

13, This is the new and old hardware. I went for flange head and flange nut to increase surface area. Also went to a finer pitch thread to allow higher torque.
Below is the old, in the middle is the two stainless washers, I used them over.

14, this is the completed assembly, note the new bolts flange fits perfectly on the frame!
In lieu of a weld I use Loctite retaining compound (green) on the nut.

15, I wrapped the new work in cloth tape to be cool.

OK, that’s all for today until another disaster happens!